We currently serve many industries throughout the Southwest. The industries that we serve range from general construction, bridge and highway construction, alternative energy, oil and gas, power plants, to the movie industry.



Caldwell Water Tanks

hoisting water tanks el paso texas

We are offloading 86,000 lb Caldwell water tanks in Horizon, Texas. We were able to use El Paso's largest mobile crane for the job, the Terex AC350/6 [400 ton]. The crane was albe to lift the 86,000 lb tanks 130 ft above the ground.

Du Pont Project El Paso

Du Pont El Paso Texas Plant

The Link-Belt HTC86100 100 ton hydraulic truck crane is working at the Du Pont plant in El Paso, Texas.

Elkhorn Compressor

elkhorn compressor lift el paso texas

We are hoisting a compressor skid that weighed 115,000 lbs. We used the Link-Belt ATC 3275 [275 ton] crane to complete the project for Elkhorn.

Gantry Crane Construction

Gantry crane construction

We are hoisting and erecting a gantry crane in El Paso, Texas. This is a two crane pick with our Link-Belt all-terrain crane and our Grove hydraulic truck crane.

Haydon Bridge Beams

bridge beam crane rental el paso

We are hoisting bridge beams in El Paso, Texas for Haydon. The cranes on the bridge construction jobsite are the P&H 5100 100 ton crawler crane and the Terex AC350/6 300 ton all-terrain crane.

P and J Arcomet

building tower crane el paso texas

We are erecting a Comedil CTT 331-16 tower crane at the El Paso International Airport CONRAC project. The total height of the tower crane that we were building was 120 ft. The Terex AC350/6 [400 ton] crane was able to lift the tower crane components.

Paseo Del Norte Flyover

Paseo Del Norte Flyover construction

We are hoisting bridge beam sections for the Paseo Del Norte bridge flyover in Albuquerque, New Mexico. The crane we used is the Grove GMK-7550.

PNM Transformer

pnm transformer gantry crane

We offloaded the transformer from a trailer with our Link-Belt ATC3275 a 275 ton all terrain crane. Then we moved the switch gear into place. Once in place we offloaded the switch gear with our gantry crane.