The Link-Belt HC 248 a 200 ton lattice boom truck crane and the Terex AC350/6 a 400 ton all terrain crane are hoisting bridge beams. […]
DAN WILLIAMS BRIDGE BEAMS

The Link-Belt HC 248 a 200 ton lattice boom truck crane and the Terex AC350/6 a 400 ton all terrain crane are hoisting bridge beams. […]
The Link-Belt HC238 setting concrete components near Durango, Colorado. […]
We are bridging the gap for Sapphire Energy. We are hoisting bridge beams for Sapphire Energy’s algae plant. The plant grows algae that is used to create biodiesel. The plant has many canals and lakes to grow algae. The bridges will span the canals. We set 4 total bridges that weighed in at 23,000lb or […]
Crane Service, Inc. set a bridge on Nimitz Road in Grants, NM with its Liebherr LTM1200 truck for Salls Brothers Construction. […]
Crane Service, Inc. has set bridge beams all over the state of New Mexico. Shown here are beams being set along Highway 84 and Reinken Rd. in Belen in November of 1999. […]
Breaking dawn in El Paso, Texas. We are hoisting bridge beams in El Paso, Texas. This is an example of our abilities to work at all hours of the day. It is easy to lose sight of what our field staff endures and experiences. Many times our operators, oilers, and service staff are working past […]
In the early 1990’s Burlington Northern Santa Fe Railroad had Crane Service install a number of bridges. The rail bridge seen below weighed in at over 200,000 lb. […]
The Terex AC350/6 and the Tadano-Faun ATF220G-5 are hoisting 160,000 lb and 60,000 lb bridge beams in Big Spring, Texas. […]
A Link-Belt ATC3275, 275 ton all-terrain crane and El Terrero Constructions Link-Belt crane, are hoisting bridge beams for BNSF and the City of Belen. The railroad bridge beams project was located in Belen, New Mexico. The bridge required 5 spans with 1 girder per span. The bridge beams weighed ~140,000 lbs. […]